JCT design and build 2024 form should be adopted ‘as soon as possible’
Employers and contractors should adopt the 2024 version of the Joint Contracts Tribunal (JCT) design and build contract as well as the design and build subcontract as soon as possible to ensure their contracts are up to date, an expert has said.